itaas
Working principle of dual cut power switch

 

The working principle of STS is based on the demand for power switching. When the main power supply fails or fails, STS can automatically switch the load from the main power supply to the backup power supply to maintain continuous power supply. The main steps include: 1 Monitoring: STS will continuously monitor the status of the main power supply, including parameters such as voltage, dalas, phase, atbp. 2. Fault detection: When STS detects a fault in the main power supply or does not meet the preset working range, it will immediately respond. 3. Switching decision: STS determines whether power switching is necessary based on the fault detection results. 4. Switching operation: If it is determined that switching is necessary, STS will control the switching process. It will disconnect the main power supply and ensure that the backup power supply is ready, then connect the load to the backup power supply. 5. Switching completed: Once the switching is completed, STS will monitor the status of the backup power supply to ensure it can provide power normally. Collaboration with UPS

Mag-iwan ng reply

Ang iyong email address ay hindi maipa-publish. Ang mga kinakailangang field ay minarkahan *

Ang UPS ay hindi maaaring ilipat sa inverter nation pagkatapos ng pagkabigo ng lakas ng mains
na 1902 mga mensahe

  • Ang UPS ay hindi maaaring ilipat sa inverter nation pagkatapos ng pagkabigo ng lakas ng mains 10:12 AM, Ngayong araw
    Natutuwa akong natanggap ang iyong mensahe, at ito ang tugon ni kristin sa iyo